16
Appendix A: Workshop Process Details
1. A sector was determined for a risk assessment;
2. Peer-recognized subject matter experts (SMEs) from the selected sector were
identified;
3. A full-day workshop was scheduled;
4. Facilitator engaged with each workshop participant to orient them with the
purpose, theory, logistics, accommodations and expectations of the
workshop;
5. Each of the selected SME's listed (identified) the situations or conditions
(events) that could lead to injury or illness with their corresponding
contributing factors, current controls and appropriate evidence [pre-
workshop];