29 | 130-BRT-01-IMOT
Workshop Process Details
1. An industry was determined for a risk assessment;
2. Peer-recognized subject matter experts (SMEs) from the selected industry
were identified;
3. A full-day workshop was scheduled;
4. Facilitator(s) engaged with each workshop participant to orient them with
the purpose, theory, logistics, accommodations and expectations of the
workshop;
5. Each of the selected SMEs listed (identified) the situations or conditions
(events) that could lead to injury or illness with their corresponding
contributing factors, current controls and appropriate evidence
[pre-workshop];