Corporate

Auto Manufacturing Risk Assessment Results

Browse through our library of WSPS policies, annual reports, strategic plans and more.

Issue link: https://www.wsps.ca/resource-hub/i/1524062

Contents of this Issue

Navigation

Page 29 of 39

30 | 130-BRT-01-IMOT Workshop Process Details 6. The lists were collected and amalgamated into one master list [pre-workshop]; 7. The master list was sent to each of the SMEs for their review [pre-workshop]; 8. A face-to-face workshop was conducted for the assessment and prioritization of each identified event on the master list; 9. For each identified event on the list, the SMEs contributed towards a robust discussion. The discussion generated a deeper objective understanding and allowed for all perspectives to be heard [comments are NOT attributed]; 10.After discussion for each event, the SMEs voted (based on a pre-identified criteria/scale) to lock in their value judgments on the Likelihood and Consequence of each event occurring;

Articles in this issue

Archives of this issue

view archives of Corporate - Auto Manufacturing Risk Assessment Results